Emerson Ovation Systems

INTRODUCTION

Our team specializes in Ovation Distributed Control Systems (DCS), which are optimized for the global power generation and water/wastewater treatment industries, providing advanced solutions for operational efficiency. Additionally, Ovation Safety Instrumented Systems (SIS) ensure a safe shutdown in the event of critical power plant equipment failures, thereby enhancing overall plant safety and reliability.

Project Initiation
  • Define Batch Requirements
  • Identify Stakeholders
  • Establish Project Scope
  • Define Project Objectives and Success Criteria
  • Assess System Compatibility

 

Functional Design
  • Conduct User Requirements Specification (URS)
  • Develop Functional Specifications 
  • Define Batch Sequences & Operations
  • Develop Functional Description Documents

 

Detailed Design
  • Develop Detailed Control Logic
  • Specify Setpoints and Alarms
  • Design Human-Machine Interface (HMI) Screens 
  • Define Control Strategies for Each Unit Operation
  • Document Batch Recipes in Detail
Software Programming
  • Write Batch Control Module Code
  • Develop Graphic Displays
  • Implement Control Strategies
  • Test Modules Code
Validation
  • Prepare Validation Documentation
  • Execute Validation Protocols
  • Document Validation Results
  • Address Validation Findings
Start-Up
  • Initiate First Batch Production
  • Monitor and Evaluate Initial Batches 
  • Address Any Start-up Issues
Documentation and Handover
  • Finalize Control System Documentation
  • Compile As-Built Documentation 
  • Complete Project Handover 
Testing and Simulation
  • Unit Testing for (Individual Components)
  • Integration Testing for (Component Interaction)
  • System Testing for (End-to-End)
  • Simulation Testing for (Real-world Scenarios)
Commissioning
  • Deploy software to the Production Environment
  • Integrate with Existing Infrastructure
  • Conduct Pre-Commissioning Checks 
  • Address Commissioning Issues
Optimization
  • Gather Operational Data
  • Analyze System Performance
  • Fine-Tune Control Strategies
  • Implement Efficiency & Improvements in control system
Project Closure
  • Conduct Project Review 
  • Document Lessons Learned 
  • Closeout Project Activities