Emerson Ovation Systems
INTRODUCTION
Our team specializes in Ovation Distributed Control Systems (DCS), which are optimized for the global power generation and water/wastewater treatment industries, providing advanced solutions for operational efficiency. Additionally, Ovation Safety Instrumented Systems (SIS) ensure a safe shutdown in the event of critical power plant equipment failures, thereby enhancing overall plant safety and reliability.
Project Initiation
- Define Batch Requirements
- Identify Stakeholders
- Establish Project Scope
- Define Project Objectives and Success Criteria
- Assess System Compatibility
Functional Design
- Conduct User Requirements Specification (URS)
- Develop Functional Specifications
- Define Batch Sequences & Operations
- Develop Functional Description Documents
Detailed Design
- Develop Detailed Control Logic
- Specify Setpoints and Alarms
- Design Human-Machine Interface (HMI) Screens
- Define Control Strategies for Each Unit Operation
- Document Batch Recipes in Detail
Software Programming
- Write Batch Control Module Code
- Develop Graphic Displays
- Implement Control Strategies
- Test Modules Code
Validation
- Prepare Validation Documentation
- Execute Validation Protocols
- Document Validation Results
- Address Validation Findings
Start-Up
- Initiate First Batch Production
- Monitor and Evaluate Initial Batches
- Address Any Start-up Issues
Documentation and Handover
- Finalize Control System Documentation
- Compile As-Built Documentation
- Complete Project Handover
Testing and Simulation
- Unit Testing for (Individual Components)
- Integration Testing for (Component Interaction)
- System Testing for (End-to-End)
- Simulation Testing for (Real-world Scenarios)
Commissioning
- Deploy software to the Production Environment
- Integrate with Existing Infrastructure
- Conduct Pre-Commissioning Checks
- Address Commissioning Issues
Optimization
- Gather Operational Data
- Analyze System Performance
- Fine-Tune Control Strategies
- Implement Efficiency & Improvements in control system
Project Closure
- Conduct Project Review
- Document Lessons Learned
- Closeout Project Activities